How long do I have to wait before I can place a Floorify floor on fresh concrete or a screed floor?

Concrete or screed floors need enough time to dry properly before it is possible to place a Floorify rigid vinyl floor on it. Rule of thumb: Wait one week per cm of screed, this applies to screed floors up to 4cm. Wait twice as long for every additional cm up to 6cm and wait 4 additional weeks for every cm above 6cm. Example: For a concrete floor of 6cm you have to wait at least (4 x 1 week) + (2 x 2 weeks) = 8 weeks before the floor is completely dry. Tip: Make sure that the room is sufficiently ventilated.